Bricking Solutions load fixture is the safest most effective design for install and removing long bridge sections spanning over 6m or more, Cement LLC’s bridge section is almost 9m coming in at 8,7m long.
Not only does the load fixture make it safe and efficient to remove and install the long bridge section but it also allows Cement LLC to lift the bridge section to rote the kiln during repairs without remove the bridge.


Cement LLC just had their new ramp and load fixture system commissioned by BBS Technical Services and used it for the first time this past Month April 4, 2013. Congratulations Cement LLC.
Contact us for a quote today!