The Frame:
Assembly of the frames has also been vastly improved. This has been done by re-engineering the frame structure to remove complexity and provide symmetry. While those two alone would have simplified the assembly greatly, Bricking Solutions took it one giant step further by removing all the bolted connections and replacing them with pins and retainer clips. No more digging around for the right size bolts, just grab a pin, insert and go.
Once the frame assembly is completed, you end up with the lightest frame assembly in the industry; one that took about 10 minutes to put together. We have tested and proven that an experienced crew can easily assembly the frames in 10 minutes. Once the frames are assembled, the decking only takes a few short minutes more to install as it, too, is now symmetrical and secured with hitch pins.The Arch
Arch Adjustment
Repairable Cylinders
New for the EZFlexx50 Bricking Machines are repairable cylinders. Unlike our previous cylinders, which were sealed with only the handle and valve replaceable, the seals in the cylinders on the EZFlexx50can be repaired in the field. These same cylinders can be used on older machines as well. You will just have to open up the mounting holes a bit to accommodate larger screws.
The Numbers
How do all these improvements equate to the bottom dollar? Let’s start with assembly times:
EZFlexx50: 30-45 minutes
EZFlexx: 2-3 hours
Competition: 6-8 hours
Now, for arguments sake, let’s say you have a 6-man crew that costs you $200/man hour. You can see upwards of $1050 savings in the first day of use over the competition. On top of that, you can gain what is, essentially, a shift of closeout. With disassembly going just as quick as assembly, you’ll save upwards of another $1000 in labor at the end as well. That’s $2000 you’ve saved with just one use, and that doesn’t reflect what you’ll save with increased efficiency while actually using the on the EZFlexx50 Bricking Machine.
With all the engineering, R&D and testing that has gone into the >EZFlexx50, one would expect the cost to increase. But, part of the scope of the redesign included revamping our manufacturing processes which resulted in lower costs. This savings we are passing on to you, our customers.